File:401 pre-widening at Keele, March 21, 1958.jpg

From Wikipedia, the free encyclopedia

401_pre-widening_at_Keele,_March_21,_1958.jpg(688 × 553 pixels, file size: 111 KB, MIME type: image/jpeg)

File information
Description

A heavily congested Toronto Bypass facing west from Keele Street on March 21, 1958. Although when it opened in 1952, the capacity of 50,000 cars per day was thought of as excessive, it would take only a few short years for traffic patterns to shift and the city to begin swallowing the farmland through which the highway passed.

Source

Archives of Ontario (Series RG-14-162-2-27, Box B983, Photo #296)

Date

March 21, 1958

Author

Department of Highways

Permission
(Reusing this file)


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current01:41, 24 November 2011Thumbnail for version as of 01:41, 24 November 2011688 × 553 (111 KB)Floydian (talk | contribs){{Information |Description = A heavily congested Toronto Bypass facing west from Keele Street on March 21, 1958. Although when it opened in 1952, the capacity of 50,000 cars per day was thought of as excessive, it would take only a few short years for

The following file is a duplicate of this file (more details):

The following pages on the English Wikipedia use this file (pages on other projects are not listed):