Talk:Follo Line/GA3

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

GA Review[edit]

Article (edit | visual edit | history) · Article talk (edit | history) · Watch

Reviewer: ---Dough4872 00:32, 2 February 2010 (UTC)[reply]
Comments:

  1. The sentence "To fully utilize this, and possibly built the rest of the Østfold Line for high speeds, it is necessary to increase capacity through the bottleneck from Oslo to Ski." sounds awkward.
  2. The sentence "Rail line capacity restrains the track to twelve trains per hour, as well freight train operation is hampered during rush hour." needs to be reworded.
  3. Even though this is a future rail line, I assume the article is not currently going through rapid changes.

I am placing the article on hold. ---Dough4872 00:32, 2 February 2010 (UTC)[reply]

Thanks for the review. Regarding 3), there is very little happening at the moment; all the important decisions have been made (start time, route, to bypass Vevelstad and Kolbotn), and it will take about eight years until completed. Unless something unusual happens, this article will remain fairly stable the next eight years, with a few amendments to construction progress and adding a few dates. The article about the Østfold Line will have changed a lot more in that time that this article. Arsenikk (talk) 11:56, 2 February 2010 (UTC)[reply]
I will pass the article. ---Dough4872 16:36, 2 February 2010 (UTC)[reply]