Sources[edit]

The column on "Website" should not be the main purpose of a column in the table for sources. The main need, per WP:V and WP:RS, is for a verifiable, reliable secondary source, for any and all claims made in Wikipedia. Sometimes, a primary source, such as the website of the company or government entity building a wind farm, is the best we have, at least temporarily. But I do think that "website" should not be the point of the column; a verifiable source should be. If we are to make the assertions made in this list, we want to find better sources than mere company websites, whether those sources are accessble via the internet (always preferable, per WP:V) or not. Cheers. N2e (talk) 17:27, 28 July 2010 (UTC)[reply]

Agree, as WP:Stand-alone_lists#Common_selection_criteria suggests; I guess the option "Short, complete lists of every item that is verifiably a member of the group" is the one until a country has like 50 offshore wind farms. I think the Website column is fine, but Refs column definitely need to be added. I revised the UK template in List of offshore wind farms in Denmark to suit most countries. Amount of columns is an ongoing issue; the many parameters on 4C is bewildering. TGCP (talk) 23:17, 30 July 2010 (UTC)[reply]
Another column should be price achieved (per kWh or MWh). As Hinkley Point C nuclear power station will cost £92.50/MWh, a new benchmark has been established, and offshore wind seems less costly. TGCP (talk) 20:56, 22 October 2013 (UTC)[reply]

Blyth[edit]

There's another offshore wind farm at Blyth (the Blyth Offshore Demonstrator Project), built in 2017: Source: [1], [2] — Preceding unsigned comment added by TheJoff (talkcontribs) 09:49, 13 July 2018 (UTC)[reply]

Gywnt y Mor[edit]

Should this be added?

In a section called "Under construction", yes please; see List_of_offshore_wind_farms#Top_10_under_construction. When a reliable source says it has been commissioned, we can include it in the main section. Making a wind farm is a process of several steps, of which power is just one. TGCP (talk) 17:58, 14 March 2015 (UTC)[reply]
Added. TGCP (talk) 18:10, 14 March 2015 (UTC)[reply]

Load factors[edit]

This paper lists recent load factors on page 5-7. Seems to be similar to capacity factor, but I'm not sure. . Source: Tools and Other Data: Draft Annual Load Factors 2014-15 TGCP (talk) 20:31, 18 November 2015 (UTC)[reply]

External links modified[edit]

Hello fellow Wikipedians,

I have just modified 6 external links on List of offshore wind farms in the United Kingdom. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 18 January 2022).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 03:14, 1 January 2018 (UTC)[reply]

dogger A[edit]

Dogger Bank is now operational, and generating power for the nation grid, though will continue to be constructed until 2026. Should it be moved to the operational table?

https://doggerbank.com/construction/worlds-largest-offshore-wind-farm-produces-power-for-the-first-time/

https://www.itv.com/news/tyne-tees/2023-10-10/worlds-largest-wind-farm-starts-producing-electricity Foxdown (talk) 13:55, 18 October 2023 (UTC)[reply]

I think if it is referred to as Dogger Bank A it could be moved to the operational table.
Is the assumption that an entry should be moved to the operational table as soon as one (or more) turbines are powered up and connected to the UK grid? Or should we wait until all 95 turbines are noted as being commissioned?
Alternatively, should an additional table be created titled "partially operational" or "being commissioned"? Zmsh99 (talk) 22:52, 26 October 2023 (UTC)[reply]