User:DRM Anand

From Wikipedia, the free encyclopedia

Jaipur ringas line via sikar broad gauge conversion has been completed . In March 2019 and speed trial of engine(diesel engine) WDM 3A has been done at the speed.of 127 km/hr. CRS trial has been done on 24 and 25 April 2019 . And green signal to run the train say been given by Comissoner . Train can run with maximum 110 km/hr.