User:Kew Gardens 613/NYSTC Annual Reports

From Wikipedia, the free encyclopedia

Third Annual Report, 1924[edit]

Subway construction[edit]

Queensboro Subway Extension[edit]

Flushing Extension[edit]

  • Revised plan crossovers 5th Avenue temporary terminal

Fort Hamilton Extension[edit]

Fourteenth Street-Eastern Line[edit]

  • Modification-crossover addition to permit partial operation, ramp to LIRR yard

Nassau Street Line[edit]

Dual Operations in Queens[edit]

  • Studies, switchback track

Station facilities[edit]

  • BMT lengthening
  • Some work IRT 10-cars
  • 96th Street mezzanine at 94th Street
  • Yankee Stadium stairways
  • Additional entrances NE/SE corners Canal and Centre Streets
  • Lawrence Street station
  • 168th Street elevators
  • Additional mezzanine southern end Wall Street/William Street
  • Drawings Williamsburg Bridge Plaza station
  • Waiting rooms northbound platforms-passengers waiting to change trains Kingsbridge Road, 219th Street
  • Improve Dyckman Street entrance
  • Lengthening Pennsylvania station
  • Platform extension Jackson Avenue station
  • New entrances Grand Central, building openings
  • Passageway Union Square
  • Lengthening platforms Canal Street
  • Waterproofing track floors over mezzanines-White Plains Road, Jerome Avenue
  • Telephone installation
  • Entrances constructed through private property
    • NE corner of 23rd Street and Fourth Avenue
    • SE corner of Fulton Street and Broadway
    • 501 Fulton Street-Brooklyn
    • 571 Fulton Street and 32 DeKalb Avenue-Brooklyn
  • Standardization of signs
  • Transformer closets for emergency lighting
  • New entrance to Borough Hall station
  • Escalator well construction-Park Place, Borough Hall
  • New double crossover north of Times Square-Broadway Line

Yards[edit]

  • Inspection shed Jerome Avenue Yard, 180th Street Yard
  • Studies 239th Street Yard
  • Siting of Westchester Avenue Yard
  • Addition Lenox Avenue shops
  • Coney Island Yard drawings

Miscellaneous[edit]

  • Newsstands
  • Temporary facilities Queensboro Plaza
  • Bridge over South Brooklyn Railway
  • Emergency lighting
  • Widening 60th Street, 52nd Street, 57th Street, 22nd Street, Canal Street
  • Ventilation exhaust chamber Broadway, fan chamber connection Times Square
  • Removal of rock reef over Whitehall-Montague Street Tubes
  • Raising street grade, Long Island City
  • New automatic turnstile
  • New electrical substation Roosevelt Avenue, Queens
  • Equipping all cars with multiple door control
  • Installation of ventilating equipment-deep level subway sections
  • Block signals-elevated lines
  • Substituting steel cars for wooden equipment on elevateds
  • IRT trailer cars
  • Signage emergency exits-deep stations
  • Experimental signal-key-by West End Line 38th Street
  • Ventilating equipment Broadway Line
  • Signal changes-improvement signal tower installations-train indication system
  • 50 new steel trailer cars
  • Changes 60-wooden cars for use in Queens

Studies[edit]

  • Strength of Jamaica Line elevated structure for steel subway cars
  • Proposed IRT improvements, i.e. express station Columbus Circle, 23rd Street, improvements at 96th Street, 137th Street loop
  • Replacement stairways 33rd/6th with entrances through Gimbel's and Saks'
  • Relieve congestion Grand Central-railing study-capacity-bottleneck
  • Extension to Yonkers-Putnam Division
  • Increased power capacity
  • Connection-Myrtle Avenue El and Fourth Avenue subway-study-change Bridge Street elevated
  • Study-power supply 14th Street Line
  • Recommendation use excess ducts under-river tunnel-telephone cables
  • Strengthening existing elevated lines Brooklyn
  • Moving platform-42nd Street-replace shuttle
  • Additional facilities for LIRR at Pennsylvania station
  • Automatic protection-surface cars-steep grades in NYC

Surveys[edit]

  • Straightening 157th Street entrances
  • Lengthening platforms
  • Northern portion of Route 78 St. Nicholas Avenue, including tentative station location
  • Brooklyn Crosstown Line Routes 70-B and 70-A-1, including tentative station location
  • Eighth Avenue-Amsterdam Avenue Line
  • Lafayette Avenue Line
  • Sewer design
  • Preliminary surveys Westchester Avenue Storage yard
  • Borings for Flushing extension, Coney Island Yard, Westchester Yard, Central Park West

Proposed lines[edit]

Parkway Rapid Transit Line[edit]

Route 70-A – Jackson Avenue, Newtown Creek and Manhattan Avenue Route

Route 70-A-1 – North Jane Street, Jackson Avenue, Newtown Creek and Manhattan Avenue Route

Route 70-B – Manhattan Avenue, Roebling Street and Bedford Avenue Route

Route 70-C – Bedford Avenue, Fulton Street and Livingston Street Route

Route 70-D — Bedford Avenue-Brighton Beach Railway Connection

Route 70-C-1 – Bedford Avenue, Fulton Street and Livingston Street Route, Revised

Route 75-F – Eighth Avenue Route, 30th Street to 59th Street

Route 76 – Lafayette Avenue Route – Bedford Avenue to Flatbush Avenue

Route 78 – Central Park West, Manhattan Avenue and St. Nicholas Avenue Route

Route 78-A – St. Nicholas Avenue, Broadway and Fort Washington Avenue

Route 78-B – Central Park, Eighth Avenue and St. Nicholas Avenue Route

Route 78-C – Fort Washington Avenue Route, 175th Street to Overlook Terrace

Route 79 – Broadway, Columbus Avenue and Manhattan Avenue Route 59th Street to 114th Street

Route 79-A – Seventh Avenue-Broadway Connection 59th Street and Seventh Avenue to 61st Street and Broadway

Traffic changes[edit]

Capitalization/securities[edit]

Tariffs[edit]

Accidents[edit]

Power[edit]

Financial condition of street railroad companies[edit]

Grade Crossing eliminations[edit]

NYC West Side Line[edit]

Litigation[edit]

Omnibus situation[edit]

Increased service[edit]

Reduction wood cars Jamaica El[edit]

Reorganization Brighton Line service-referendum[edit]

Petition denied request reduce service IRT[edit]

Request-purchase new cars[edit]

LIRR, surface line new cars[edit]

Through-service Pelham Line Sundays-May 27th[edit]

Additional train late night Jerome Avenue[edit]

2 additional Saturday night Brooklyn express West Side line[edit]

Increased Third Avenue el express service[edit]

Improved elevated facilities[edit]

Extension 9th Avenue el express service[edit]

Midday through-service Queens line elevated[edit]

Rerouting trains steel car to Broadway Line from Lexington Avenue Line[edit]

Increases-Sea Beach, Fulton Street, West End, Brighton, Fourth Avenue[edit]

Dual service Queens[edit]

Indicated points-train stops-Broadway Line[edit]

Additional transfer provisions Brooklyn surface[edit]

Service extensions, new Vanderbilt Avenue line short-line service[edit]

Reconstructed trailer cars-motorcars[edit]

New 14th Street service[edit]

Additional service 59th Street[edit]

Eighth Avenue Railroad new barn[edit]

Tremont Avenue crosstown extension[edit]

Extension Boston Road Line[edit]

Rerouted Jamaica-College Point line-connection-subway[edit]

Corona Line-extended College Point rush hours[edit]

New short-line service Jamaica line[edit]

New one-person cars in service[edit]

Double tracking, increased service-Ocean Electric Railway Company[edit]

Moving zone point-Manhattan andQueens Traction, extension Jamaica[edit]

LIRR-increased service-25 cars-Rockaway Division/Far Rockaway Division[edit]

40 cars-rush hour-Flatbush Avenue, Penn Station[edit]

Additional stops Frank Avenue, St. Albans[edit]

Increases New Haven Line-all-night service[edit]

Shelters-added exit platforms three SIRT stations[edit]

Property acquisition[edit]

Platform extensions[edit]

Jackson Avenue Station Lengthening[edit]